Santa Clara Valley Medical Center – Ancillary Building Seismic Upgrade | San Jose, CA

$0.00

Seismic upgrade of an occupied hospital building, strengthening foundations and concrete shear walls from the basement through the fourth floor. The work was performed within an active patient care environment and required careful coordination to maintain hospital operations throughout construction.

JKL provided preconstruction and construction management services, including field coordination with hospital departments, utility shutdown planning, inspection and testing coordination, infection control, quality assurance, submittal processing, cost control, and OSHPD interface.

Construction: Structural Seismic Upgrade
Owner: Santa Clara Valley Medical Center
Type of Contract: Construction Management

Seismic upgrade of an occupied hospital building, strengthening foundations and concrete shear walls from the basement through the fourth floor. The work was performed within an active patient care environment and required careful coordination to maintain hospital operations throughout construction.

JKL provided preconstruction and construction management services, including field coordination with hospital departments, utility shutdown planning, inspection and testing coordination, infection control, quality assurance, submittal processing, cost control, and OSHPD interface.

Construction: Structural Seismic Upgrade
Owner: Santa Clara Valley Medical Center
Type of Contract: Construction Management