JKL has supported a wide range of projects across the Lockheed Martin Sunnyvale campus, delivering both design-build and general contracting services for ongoing facility upgrades, infrastructure improvements, and specialized laboratory environments. Work has included tenant improvements, mechanical and electrical upgrades, lab expansions, and campus-wide safety and infrastructure enhancements.
Our team has consistently delivered projects within an active, high-security environment, coordinating closely with facility operations to maintain continuity while executing technically complex scopes. This ongoing relationship reflects JKL’s ability to support mission-critical facilities with responsiveness, precision, and a strong understanding of campus systems. Image © Google Earth
B150 & B154 – Tenant improvements and facility upgrades
B151 – Vacuum chamber removal and XL chamber installation
B152 – Addition of work cubicles
B153 – O2 monitor replacement and laboratory expansion
B153A – Data conduit installation and restroom remodels
B154 – MSP office area remodel
B156 – Restroom upgrades, piping assessment, and cafeteria remodel
B156A – Site lighting improvements
B156E – ROFI lab expansion and UPS replacement
B159 / B159C / B159D – Ladder replacement, freezer relocation, and equipment removal
B174 – Roll-up door replacements and ventilation system modifications
B176 – Flooring leveling improvements
B181 – SE lab relocation, data center, and HVAC upgrades
B182 – DevOps office improvements and rooftop mechanical replacement
B186 – Cooling tower replacement
B195 / B195B / B195D – EMI chamber replacement, training room upgrades, and restroom renovations
B201–207 – Campus-wide safety upgrades
Site Work – Plant 1 gas line replacement and energy efficiency improvements (parking lot lighting)
JKL has supported a wide range of projects across the Lockheed Martin Sunnyvale campus, delivering both design-build and general contracting services for ongoing facility upgrades, infrastructure improvements, and specialized laboratory environments. Work has included tenant improvements, mechanical and electrical upgrades, lab expansions, and campus-wide safety and infrastructure enhancements.
Our team has consistently delivered projects within an active, high-security environment, coordinating closely with facility operations to maintain continuity while executing technically complex scopes. This ongoing relationship reflects JKL’s ability to support mission-critical facilities with responsiveness, precision, and a strong understanding of campus systems. Image © Google Earth
B150 & B154 – Tenant improvements and facility upgrades
B151 – Vacuum chamber removal and XL chamber installation
B152 – Addition of work cubicles
B153 – O2 monitor replacement and laboratory expansion
B153A – Data conduit installation and restroom remodels
B154 – MSP office area remodel
B156 – Restroom upgrades, piping assessment, and cafeteria remodel
B156A – Site lighting improvements
B156E – ROFI lab expansion and UPS replacement
B159 / B159C / B159D – Ladder replacement, freezer relocation, and equipment removal
B174 – Roll-up door replacements and ventilation system modifications
B176 – Flooring leveling improvements
B181 – SE lab relocation, data center, and HVAC upgrades
B182 – DevOps office improvements and rooftop mechanical replacement
B186 – Cooling tower replacement
B195 / B195B / B195D – EMI chamber replacement, training room upgrades, and restroom renovations
B201–207 – Campus-wide safety upgrades
Site Work – Plant 1 gas line replacement and energy efficiency improvements (parking lot lighting)